![](https://www.turcomp.com/wp-content/uploads/2023/10/EPCIC-of-PL431-PL436-PL314-PIPELINE-REPLACEMENT-AND-TOPSIDE-MODIFICATION-PROJECT-04-300x300.jpg)
Name of Project
EPCIC of PL431, PL436 & PL314 Pipeline Replacement and Topside Modification Project
Award Date
2023
Client
Petronas Carigali Sdn Bhd
![](https://www.turcomp.com/wp-content/uploads/2023/10/Sarawak-Shell-Berhad-Flexible-pipe-for-FAS-Project-300x225.jpg)
Name of Project
Supply and Delivery of Flexible Pipe for FAS Project
Award Date
2023
Client
Sarawak Shell Berhad
![](https://www.turcomp.com/wp-content/uploads/2023/10/01-Rental-of-Subsea-Wellhead-Equipment-Petronas-Carigali-Sdn-Bhd.png)
Name of Project
Provision of Rental of Subsea Wellhead Equipment, Tools and Services
Award Date
2022 – 2025
Client
Petronas Carigali Sdn Bhd
![pipeline 2021](https://www.turcomp.com/wp-content/uploads/2021/03/Pipeline-2021.jpg)
Name of Project
Provision of Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) for PL429 Pipeline Replacement Project
Award Date
March 2020
Client
Petronas Carigali Sdn Bhd
![](https://www.turcomp.com/wp-content/uploads/2023/04/Jerun-Project.png)
Name of Project
To Supply and Deliver of Ball Valves (JRN-A) For EPCIC of SK408 Jerun Development Project
Award Date
2022
Client
Malaysia Marine and Heavy Engineering (MMHE)
![](https://www.turcomp.com/wp-content/uploads/2021/03/Raph-A.jpeg)
Name of Project
U2 Mini Outage 2020 – Supply of Repair Kit, Dismantling, Inspection, Service, Calibration, Installing & Painting for 6 Units of Control Valve Actuator (Maker: Nakakita Seisakusho)
Award Date
March 2020
Client
JEV Power Plant
![](https://www.turcomp.com/wp-content/uploads/2021/03/IMG_4187-scaled.jpg)
Name of Project
U1 Major Outage 2019 – Supply of Repair Kit, Dismantling, Inspection, Service, Calibration, Installing & Painting for 25 Units of Control Valve Actuator (Maker: Nakakita Seisakusho)
Award Date
March 2019
Client
JEV Power Plant
![](https://www.turcomp.com/wp-content/uploads/2021/03/plant.png)
Name of Project
Instrument Maintenance & Services for Petronas Operating Plant Units (OPU):Package 1 – Instrument Actuated Valve
Award Date
November 2019 – November 2022
Client
Regas Terminal (Sungai Udang) Sdn Bhd
![](https://www.turcomp.com/wp-content/uploads/2021/03/project-N.jpeg)
Name of Project
Manual Valve for SASA INFILL (Post Shutdown)
Award Date
7 December 2020
Client
Dayang Engineering Services Sdn Bhd