![](https://www.turcomp.com/wp-content/uploads/2023/10/EPCIC-of-PL429-PL430-Pipeline-Replacement-Project-COPY-01.jpg)
EPCIC of PL429 & PL430 Pipeline Replacement Project, Petronas Carigali Sdn Bhd
2020 – 2021
![Equipment Coke Drum (2 unit Only At Malaysia)](https://www.turcomp.com/wp-content/uploads/2021/03/WhatsApp-Image-2021-02-27-at-07.55.13.jpg)
MRCSB V-32201 (PMT 111743) & V-32202 (PMT 111744) Circumferential Weld Repair For Internal & External by Welding With PWHT
Equipment Coke Drum (2 unit Only At Malaysia)
15 October 2020-31 January 2021
![](https://www.turcomp.com/wp-content/uploads/2021/02/MECSB.jpeg)
CF Renewal F51202 Activity At MRCSB Melaka July-Dec 2020
![](https://www.turcomp.com/wp-content/uploads/2019/12/check-valve.jpg)
Supply and Delivery of Check Valves, Solar Alert Murphy Oil Co. Limited, 2018
![](https://www.turcomp.com/wp-content/uploads/2019/12/sapura.jpg)
Supply And Delivery of Gate, Globe and Check Valves, Sapura Energy, 2018
![](https://www.turcomp.com/wp-content/uploads/2019/12/11-copy.jpg)
To Supply Materials, Consumables, Labors, Testing And Quality Inspection & Control For The Construction of 1 unit Sodium Hypochlorite Injection Skid for GascoTaweelah Gas Compressor Station Project, Sodium Hypochlorite Skid with GRVE Pipes & Tank,I M Kinetic Asia Pte Ltd, 2017
![](https://www.turcomp.com/wp-content/uploads/2019/12/12.jpg)
To Supply Materials, Consumables, Labors, Testing And Quality Inspection & Control For The Construction of 1 unit Chemical Injection Skid with Corrosion Inhibitor & Biocide for GascoTaweelah Gas Compressor Station Project, Corrosion Inhibitor & Biocide Skid, I M Kinetic Asia Pte Ltd, 2017
![](https://www.turcomp.com/wp-content/uploads/2019/12/13.jpg)
To Supply And Delivery To Site of Caisson Pump For PCSB SEPAT PHASE 2A Project, Air Operated Double Diaphragm (AODD) Pump with Hastelloy C Material, MMHE Sdn Bhd, 2017
![](https://www.turcomp.com/wp-content/uploads/2019/12/IMG_0181.png)
Portable Injection Pump Skid (Glycol) for ExxonMobilGuntong EOR Early WAG Project-Guntong C, Chemical Injection (CI) Skid, Woodgroup Engineering Sdn Bhd , 2017
![](https://www.turcomp.com/wp-content/uploads/2019/12/IMG_0179.png)
Supply Of Two (2) Units Chemical Injection Pumps (Gas Driven) For SKO D21JT-A – Workover Campaign Scope – Pour Point Depression Package (PPD), Dayang Enterprise Sdn Bhd, 2017
![](https://www.turcomp.com/wp-content/uploads/2019/12/IMG_0183.png)
Supply Of Two (2) Units Chemical Injection Pumps (Gas Driven) For SKO D21JT-A – Workover Campaign Scope – Corrosion Inhibitor Package (CI), Dayang Enterprise Sdn Bhd, 2017
![](https://www.turcomp.com/wp-content/uploads/2019/12/IMG_0178.png)
To Supply And Deliver Chemical Injection System And Tote Tanks for SKG F12-JT Project, Corrosion Inhibitor Skid, MMHE Sdn Bhd, 2016/17
![](https://www.turcomp.com/wp-content/uploads/2019/12/2.jpg)
To Supply And Deliver Chemical Injection System And Tote Tanks for SKG F12-JT Project, Methanol Skid, MMHE Sdn Bhd, 2016/17
![](https://www.turcomp.com/wp-content/uploads/2019/12/3.jpg)
To Supply And Deliver Chemical Injection System And Tote Tanks for SKG F12-JT Project, 6 Units of Tote Tanks with DNV approval, MMHE Sdn Bhd, 2016/17
![](https://www.turcomp.com/wp-content/uploads/2019/12/manual-valve.jpg)
Supply and Delivery of Manual Valves Tote Tanks for SK310 B15 Development Project, Sapura Energy, 2016/17
![](https://www.turcomp.com/wp-content/uploads/2019/12/api-10K-valves.jpg)
Supply and Delivery of API 10K Valves for SK310 B15 Development Project, Sapura Energy, 2016/17
![](https://www.turcomp.com/wp-content/uploads/2019/12/6.jpg)
To Supply And Deliver Portable Water Pump for SKE SK310 B15 Development Project, ITTGoulds Centrifugal Pump, SapuraKencana HL Sdn Bhd, 2016
![](https://www.turcomp.com/wp-content/uploads/2019/12/4.jpg)
Portable Air Driven Pump for Engineering, Procurement And Construction (EPC) Of Wellhead Platform ForRepsol OilKinabalu Redevelopment Project, Air Operated Double Diaphragm (AODD) Pump Skid, OceanMight Sdn Bhd, 2016
![](https://www.turcomp.com/wp-content/uploads/2019/12/IMG_0180.png)
To Supply And Deliver Open Drain Caisson Pump for SKE SK310 B15 Development Project,Air Operated Double Diaphragm (AODD)with Hastelloy C Pump Material Skid,SapuraKencana HL Sdn Bhd, 2016
![](https://www.turcomp.com/wp-content/uploads/2019/12/15.jpg)
Servicing Of Steam Coil Air Heater (SCAH) and BOP Condensate Pump During Planned Outage (30th August – 8th October 2016) For GF2 Boiler Maintenance Section At Stesen Janakuasa Sultan Azlan Shah, Janamanjung. ITT Goulds Pump, 2016
![](https://www.turcomp.com/wp-content/uploads/2019/12/14.jpg)
To Supply, Delivery, Installation and Commissioning To Ranhill Powertron, Sepanggar Bay (Kota Kinabalu, Sabah) of Cooling Water Pumps (Closed Loop) For Gas Turbine 11 Upgrading Project, KSB MCPK (non-API) Pump with SS316 Material, 2016
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-1.1.jpg)
Provision of Supply, Delivery, Install, Testing and Commissioning of Four(4) Units of Polymer Preparation Skid complete with Tank for Sohar Refinery Improvement Project, SIEMENS Singapore, 2015 /16
![](https://www.turcomp.com/wp-content/uploads/2019/12/DBB-valves.jpg)
Supply And Delivery of DBB Valves for Guntong EOR Early WAG Project, Wood Group and ExxonMobil, 2015 /16
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-7.1.jpg)
Repair, Testing & Commissioning of API 676 Progressive Cavity Pump for Sump Pit – GPP-B PETRONAS Gas Berhad, 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-2.1.jpg)
Provision of Supply and Delivery of Chemical Injection Skid, Chemical Injection Pump and CI FEED Tank for TAPIS E Platform, Sapura Kencana HL Sdn Bhd , 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-3.1.jpg)
Provision of Supply, Delivery, Testing and Commissioning of One (1) Unit of OHD Caisson Pump for MURPHY SASA Platform , Bumi Jaya Engineering Sdn Bhd, 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-4.1.jpg)
Provision of Supply, Delivery, Install, Testing and Commissioning of Four(4) Units of Chemical Injection Skid complete with Partitioned Tank for MISC MAMPU Project, NGL Tech Sdn Bhd, 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-5.1.jpg)
Provision of Supply, Delivery, Install, Testing and Commissioning of Two(2) Units of Chemical Injection Skid complete with Tank for Murphy South Acis Satellite (SASA) Topsides Project, Brooke Dockyard, 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-6.1.jpg)
Provision of Supply, Delivery, Testing and Commissioning of One (1) Unit of Closed Drain Pump for TALISMAN Bunga Rya Platform , Bumi Jaya Engineering Sdn Bhd, 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/IMG_0182.png)
To Rent And Deliver of William Pump Skid, Chemical Injection Skid with complete set (CI Skid),ScomiSosma Sdn Bhd, 2015
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-8.1.jpg)
Supply and Delivery of On/Off Valve to Dew Point Control Unit 2 (DPCU2) for Plant Revamp & Rejuvenation 4 (PRR4), PETRONAS Gas Berhad / Toyo Engineering & Construction Sdn Bhd, 2013/14
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-9.1.jpg)
Provision of N2 Generator Package, Pakistan Refinery Limited, 2013
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-10.1.jpg)
Provision of Supply, Delivery, Install, Testing and Commissioning of Two (2) Units of Nitrogen Generators at Labuan Gas Terminal-2 (LGAST-2), Petronas Carigali Sdn Bhd – Sabah Operation (SBO), 2012/13
![](https://www.turcomp.com/wp-content/uploads/2019/12/project13.1.jpg)
Design, Supply of Materials, Manufacture, Test and Delivery of Air Compressor and Air Dryer Package for KPOC Topsides, Malaysia Marine and Heavy Engineering Sdn Bhd, 2011/12
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-11.1.jpg)
Supply, Testing & Commissioning of Cryorgenic On/Off Butterfly Valves and Motorised ESD Ball Valves for LNG Regasification Unit (LEKAS), PETRONAS Gas Berhad / Ranhill Worley Parson, 2011/12
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-12.1.jpg)
Design, Supply, Deliver, Testing & Commissioning of Air Compressor and Air Dryer Package for the LNG Regasification Unit (LEKAS), Petronas Gas Berhad / Ranhill Worley Parson, 2011
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-14.1.jpg)
GF3 Conveyor Structure restoration works at Sultan Salahuddin Abdul Aziz Power Station, Kapar, Kapar Energy Ventures Sdn Bhd, 2010
![](https://www.turcomp.com/wp-content/uploads/2019/12/complete-project-13.1.jpg)
Corridor Project Erection of Piperacks and Installation of All Utilities Interconnections, PETRONAS Chemicals Methanol (Labuan) Sdn Bhd, 2009/10